Pages

Tuesday, September 17, 2013

I Think I Need A Gold Star------------




After errands and finishing the last of the windows (that's why I need a gold star), I loaded the 'String Squares 2' quilt on the Crown Jewel.      
I even had enough time to quilt three rows.  I still need lots more practice.  I'm using a freehand all over pattern that I used a lot on my DSM.


I also sewed the label on this Crosses and Double Nine Patch quilt that I will give as a wedding gift.
 It is 81 x 90".  I made it in 2007. Somewhere around here I have another set of blocks.  Seems like I tried to make the second set more cohesive. We'll see when i ever find them again.
I find that it works better for me to have a couple of quilts on hand to choose  from when I need a gift rather than try to make them as needed.  Less stress!

Monday, September 16, 2013

Progress Update


Found this flannel that I bought at Joann's a couple of years back.  I like that the blue is the same color as the border.  So in between segments of DWTS, I pieced it for the back of the woven strings. 
 It will be a good practice quilt for the quilt machine.  

Sunday, September 15, 2013

Progress Report


Last week I finished the third top in the Baby Dresden Series.  I still have quite a few blocks.  It measures  50 x 50".


Tuesday was Stitch's Garden Class at Thistlebee in Goldsboro.  We had a bonus block this month too!


Wow, I can't believe I have already finished this top that I started just a few weeks ago.  Thanks to insomnia! The center is 70 x 70"so I added 3 - 2 inch boarders on the sides and 3 - 3 inch borders for the top and bottom.  The top is 82 x 88".

Of course I started another project.  I am cutting scraps for a smaller block version of the Arrow Star quilt.

I need to sew a label on a quilt that I picked out to give to my niece for her wedding this Saturday.  Happy quilting!

Wednesday, September 4, 2013

Afternoon Sewing


Molly made cupcakes for her Mom's 50th Birthday Party.  It was fun, and she was really surprised!
We had a big crowd up at the lake Saturday.  It was good to catch up with some folks we hadn't seen in awhile.


Baby Dresden II

Time to get back to all those Dresden blocks I had started a few months back.  I used  scraps of  old rick rack to edge the blocks and the centers.  I used a blue border so that it could be for a boy.  It is 50 x 50".

I have the third version started  - hopefully I will finish another top this week.






Thursday, August 29, 2013

Bunkhouse Half Log Cabin Finished


Made from repurposed plaid shirts, it is 72 x 72".  It was the fifth quilt that I finished on the Crown Jewel.  Just quilted with meandering and loops.  I washed it and it is very soft.  A little to long for the clothesline.


I cut way too many strips for the spider web quilt so now I will use them and others to make another string quilt. You can see the one I made in 2012  here .


Today was errand day. I was gone all day  When I got back home with my repaired Bernina and some accessories for the Crown Jewel, there was a package of fabric on the porch. How good is that!





Tuesday, August 27, 2013

Quilting Machine



In July, just before my birthday, my quilting machine arrived.  We had it installed in the "little house" as we have always called it.  It's just out in the backyard and makes a great place for it.  I can run down there whenever I have a little time to use it.


I have been practicing.  I did 4 small quilts for SafeChild in a meander pattern.  Then graduated to adding loops and stars to the meanering.


This small quilt is done in a pattern that I used a lot on my DSM.  
Lots more practice needed.
T

Sunday, August 25, 2013

Stitcher's Garden - August


The focus of the August block was to add piping between the block and the first border and also between the 2nd and 3rd border.  My block turned out a little smaller than it was supposed to be so I will have to adjust when it comes time to stitch the blocks together.